Hi,
Take basis team help and ask them to see the WE05/20.
partner profile need to be active.
Ask basis team to maintain proper logical mappings between ECC and BW.
table - RSLOGSYSMAP.
Thanks
Hi,
Take basis team help and ask them to see the WE05/20.
partner profile need to be active.
Ask basis team to maintain proper logical mappings between ECC and BW.
table - RSLOGSYSMAP.
Thanks